on quality work
Posted: October 17, 2022 Filed under: SoCal Life Leave a commentI have written about how we have done a sort of incremental kitchen remodel in the seven plus years we have been here. (I still can’t fathom that it’s been over seven years.)
We have replaced all the built-in kitchen appliances that were here when we bought the house. We moved here in 2015 and the house was built in 2006, so the appliances were nine years old when we got here. Our final built-in replacement was the dishwasher. We are still getting the hang of the new one, but we really like it.
One addition we made when we did our kitchen remodel in Gilroy was to add track lighting over the kitchen counter. We have good lighting in our kitchen, but it was not optimal when doing prep work on the counter or when washing pots and pans in the sink.
That’s why we asked our contractor to install track lighting over the sink and prep counter. His electrician did that, and the result is marvelous. We love it.
But to do so he had to cut two holes into the wall in the dining area. So our contractor sent over his painter, who patched, textured, and painted. You would never know that the electrician had cut into the wall. There is no evidence.
There’s no point in showing you a photo of a wall on which it looks like nothing was done, so I’ll simply offer you a picture of our new track lights.
Terry and I are pleased.